MISSION OF COAL INDIA - To produce and market the planned quantity of coal and coal products efficiently and economically in an eco-friendly manner with due regard to safety, quality and conservation. VISION OF COAL INDIA - To emerge as a global player in the primary energy sector committed to provide energy security to the country by attaining environmentally & socially sustainable growth through best practices from mine to market.

POPULATION OF EQUIPMENT (HEMM)

Population of Equipment as on 31st March 2018 compared to 31st March 2017:

Equipment

No. of Equipment as on

31.03.2018

31.03.2017

Dragline

1

1

Dumper

252

254

Dozer

82

86

Shovel

54

48

Drill

48

49

Percentage availability and utilisation of each type of equipment against CMPDIL norms during the year 2017-18 compared to previous year is as follows:

Equipment

Percentage Availability

Percentage Utilisation

CMPDIL Norms

2017-18

2016-17

Variation over last year

CMPDIL Norms

2017-18

2016-17

Variation over last year

Dragline

85

74.08

39.83

34.25

73

57.45

38.05

19.40

Dumper

67

83.56

80.02

3.54

50

31.83

36.69

-4.86

Dozer

70

74.47

73.25

1.22

45

23.53

24.09

-0.56

Shovel

80

79.16

80.68

-1.52

58

47.00

47.86

-0.86

Drill

78

84.87

84.74

0.13

40

20.52

19.08

1.44

Availability of equipment suffered mainly because:

The %age availability of Dumper, Dozer and Drill is more than CMPDIL norms. The %age availability of Dragline is less than CMPDIL norms due to failure of propel crank shift since June-2016. At present the machine is in operating condition from 21st December, 2017. The %age availability of shovel is marginally less than the CMPDI norms and also less than the previous year because of failure of rack pinion in EKG shovel, failure of under carriage and final drive in BE1000 shovel and failure of hydraulic pump in Demag shovel.

Utilisation of equipment suffered mainly because:

Project

Constraints

Rajmahal

Land problem, crowding of equipment, poor reliability of 170T dumpers and delay in procurement of 190T dumpers and 20cum shovel

Sonepur Bazari

Failure of LHS propel shaft of Dragline since June, 2016. The machine is in operation since 21st December, 2017. Further there was less availability of surveyed off 10cum shovel.

Shankarpur

Underground galleries, fiery face and difficult mining conditions.

Mohanpur

Land problem.

Jambad

Land acquisition problem and watery face.

Steps taken to achieve CMPDIL norms of Dumper Utilisation:

Reviews of HEMM performance of projects are being done at regular intervals and subsequently necessary assistance/help was provided from HQ to reduce breakdown hours of equipment.

New/Replacement equipment provided to OCPs in 2017-18 is as under:

Equipment

No

Project

Dumper

16

Bansra-2, Khottadih-1, Baramuri-1, Chitra-1, Shankarpur-5 and Sonepur-6.

Dozer

8

Jambad-1, Khottadih-3, Shankarpur-3 and Sonepur-1.

Shovel

10

Sonepur-4, Shankarpur-1, Rajmahal-1, Baramuri-3 and Bansra-1.

Drill

2

Shankarpur-1 and Jambad-1.







DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.

Copyright 2019 EASTERN COALFIELDS LIMITED,
Sanctoria, Post: Dishergarh, Dist.: West Bardhaman, W.B., PIN - 713 333 Tel: 0341-2520052-53, 2520414 Fax: 0341-2523574 Gram: EASTCOAL